The Challenge
This 6 story, 69,000 sq.ft. building is located next to The Moncton Hospital. Tenants include physicians, specialized services clinics, and Nursing Faculty. The building’s HVAC system includes washroom exhaust fan system, air handling units, humidifiers, chiller, cooling tower, heat coils, dual duct VAV boxes and baseboard heaters. Prior to engagement with PMC, the PAB consumed over 2.6 million kWh of electricity, resulting in over $290,000 in annual energy expenditure.
The Solution
We conducted a detailed energy audit, and determined that through the implementation of targeted retrofits, a 62% reduction in annual energy usage could be attained with no upfront capital cost requirements.


